Call: +48 22 266 25 58
Wiśniowski winter promotion: garage doors with openers up to −25%, fences and doors up to −15%, orders by 31 DecemberGarage doors up to −25% · until 31 DecemberDetails ›
Home › Blog › The most common mistakes when ordering a fence
Choosing

The most common mistakes when ordering a fence

11 September 2026 · updated 6 October 2026 · 4 min read · Ogrodzenia ISS

A fence is something you order only once in a long while, yet the decisions get made in a few days. The ten mistakes below are the ones we see most often, from a colour chosen on screen to no power at the gate. You can check every one of them before signing the order, and there’s a checklist to tick off at the end.

1. Choosing the colour from a screen or a small sample

Anthracite on a monitor and anthracite on thirty metres of fence panels in the sun are two different colours. Look at a sample outdoors, ideally against the façade of the house, in the daytime and in the evening. The same RAL number in a different coating texture and from a different coating plant can vary in shade.

2. Sizing the gate ‘by eye’ without measuring the entrance

Gate width isn’t just about the car. The angle of approach from the road matters, as do the turning circle and the space for the leaves to open into the plot, or for a sliding gate to slide back (about 1.5 × the clear opening, along the fence). A gate that’s 50 cm too narrow means stress every time you park.

3. No power at the gate

Automation needs power at the post. If the cable isn’t in before the paving is laid, you’re left breaking it up. Plan a duct from the house to the gate, even if you buy the motor later. The 230 V connection is made by a qualified electrician.

4. Skipping the plinth ‘because it’s expensive’

Without a plinth, grass and weeds grow under the panels, the dog digs its way under, and the bottom of the fence gets dirty fastest. A system plinth is a small percentage of the total cost, but it makes a big difference to how the fence looks and works.

The most expensive mistake is changing your mind once manufacturing has started. Components are made to measure and in a specific colour: ‘actually, let’s go with a different colour’ means a new order and a new lead time.

5. A pedestrian gate on the wrong side

The pedestrian gate should be where you actually walk in: by the path to the front door, close to where you park. A pedestrian gate placed next to the driveway gate ‘because that’s the standard’ often ends up being bypassed, with guests walking in through the driveway gate.

6. No notification when one was needed

A fence up to 2.2 m high needs neither a permit nor a notification, including along a road. A fence taller than 2.2 m requires a notification (zgłoszenie) to the county office (for Piaseczno: Starostwo Powiatowe w Piasecznie), and the county head (starosta) has 21 days to object. Height is measured from ground level to the highest point, including posts and caps. The local zoning plan (MPZP) or a landscape resolution (uchwała krajobrazowa) may restrict height, design and colour, so check them with the municipality (gmina) before ordering.

7. Not thinking about the details

Letterbox, house number, intercom, lighting: if they aren’t in the plan, they’ll end up on the fence ‘somehow’. Decide on them before ordering; a post factory-prepared for an intercom looks better than a box tacked on afterwards.

8. Choosing the fence without reference to the house

The fence, the garage door and the front door should go together: colour, character, the rhythm of the lines. Ordered separately from three different companies, they rarely form a coherent whole.

9. Saving on installation

The best panels look bad on crooked posts. Installation is not the place to save money. A post set shallower than frost depth (1.0 m around Piaseczno) goes out of plumb after the first winter, and fixing it means dismantling a section.

10. Ordering ‘right now’ at the height of the season

In spring and summer, manufacturers’ queues are at their longest. If you want the fence up for summer, order in winter.

Checklist before signing the order

Go through this list with the quote in front of you. If every item is ticked off, the order is ready to sign.

  • Colour checked on a profile sample, outdoors, against the façade.
  • Gate width based on measuring the entrance and the turning circle.
  • Power, or a duct, run to the driveway gate and pedestrian gate.
  • Position of the intercom, letterbox and house number agreed.
  • Height and design decided separately for the front, sides and back.
  • Local zoning plan checked with the municipality; notification submitted if the fence is over 2.2 m.
  • Plinth included in the quote on the right sections.
  • Manufacturing and installation dates written into the order, along with what the customer can do to speed them up (plot ready, power in place).

More on choosing a system for your property: fences and driveway gates.

Frequently asked questions

Does a fence along the road need a notification?

No, as long as it’s no higher than 2.2 m. The requirement to notify fences along roads was abolished in 2015. A taller fence has to be notified to the county office wherever it stands.

Does my neighbour have to pay towards a fence on the boundary?

There’s no such obligation. Article 154 of the Civil Code (Kodeks cywilny) concerns sharing the cost of maintaining a fence that stands on the boundary. A neighbour only contributes to the cost of building one if you agree on it. A fence centred on the boundary line stands partly on the neighbour’s land, so it needs their consent; a fence entirely on your own plot does not.

How do I check out a contractor?

Look at their completed installations (ideally in person, or in the manufacturer’s gallery), and ask whether they’re authorised by the system manufacturers, what warranty they give on installation, and who is responsible for the installation team and for servicing after installation.

Sources

Legal position as of October 2026. General information, not legal advice.

Quote after a site survey

We’ll come out for a site survey and prepare a quote within 7 working days of it. There is a charge for the site survey because it covers travel, measurements including levels, and choosing the system; the cost is agreed individually and deducted from your order. Manufacturer’s warranty – Wiśniowski fences come with an anti-corrosion warranty of up to 10 years. The terms of our own installation warranty are set out in the quotation.

Request a quote