Fence regulations in 2026
In September 2026 the media wrote about ‘new bans from 20 September’. As of 8 October 2026 the picture is different: the 2002 regulation on technical conditions (warunki techniczne) lost its legal basis on 20 September, there is no new regulation yet, and the new values (2.2 m for sharp elements, 0.9 m for pedestrian gates, 2.4 m for driveway gates) are a draft. The Construction Law (Prawo budowlane) provisions on notifying fences have not changed: a fence higher than 2.20 m requires a notification (zgłoszenie). Below, what this means if you are building a fence in Piaseczno or Konstancin.
Two different 2.2 m limits
The most common mistake: mixing up two different regulations that both mention 2.2 m.
- Construction Law (Articles 29–30): covers formalities. A fence up to 2.20 m high requires neither a permit nor a notification, including on the road side. A higher one must be notified to the county office (starostwo), which has 21 days from receiving the notification to object. This is in force and nothing has changed here.
- Technical conditions (2002 regulation): covered safety. Sharp tips, barbed wire and broken glass were not allowed on a fence below 1.8 m. The regulation lost its legal basis on 20 September 2026, and the draft of the new one sets the limit at 2.2 m. It is still only a draft.
What happened on 20 September 2026
The 2002 regulation on technical conditions (which included the ban on sharp elements below 1.8 m and the ban on driveway and pedestrian gates opening outwards) lost its legal basis on 20 September 2026. As of 8 October 2026 no new regulation had been issued. The Act of 31 July 2026 (Dz.U. 2026 poz. 1161) added temporary provisions to the Construction Law (Articles 102a–102c): for 18 months from 20 September 2026, investors (whoever is having the work done) may apply the previous technical rules to building permit applications and notifications (Article 102a, after submitting a declaration) and to construction that requires neither a permit nor a notification (Article 102b).
A fence up to 2.20 m is exactly that: construction without a permit and without a notification (Article 29(2) of the Construction Law), so Article 102b allows the previous rules to be applied to it. That is how we install: driveway and pedestrian gates open inwards into the plot, and we do not fit sharp elements (barbed wire, broken glass) below 1.8 m.
Table of changes
| Topic | Today (as of 8 October 2026) | Draft new technical conditions | What it means in practice |
|---|---|---|---|
| Fence notification | Above 2.20 m, notification to the county office, 21 days to object; up to 2.20 m, no formalities (Construction Law) | No change; the draft concerns the regulation | Most residential fences (1.4–2.0 m) need no paperwork |
| Sharp elements, barbed wire, glass | No regulation in force; the previous ban below 1.8 m can be applied for 18 months (Articles 102a–102b) | Banned below 2.2 m | We do not fit them below 1.8 m; for a new fence it is safer to work to 2.2 m |
| Opening direction of driveway and pedestrian gates | No regulation in force; the previous ban on opening outwards, as above | Inwards into the plot | The leaves of a double swing gate open into the property; a sliding gate doesn’t have this problem |
| Minimum driveway gate width | No regulation in force | 2.4 m clear width | A typical entrance is 4–5 m, so the limit is not a problem |
| Minimum pedestrian gate width | No regulation in force | 0.9 m clear width | A standard pedestrian gate is 1.0–1.2 m |
| Transitional period | Temporary provisions, Articles 102a–102c of the Construction Law (Act of 31 July 2026, Dz.U. 2026 poz. 1161): 18 months from 20 September 2026 to apply the previous rules to applications, notifications and construction that needs no notification | Work on the regulation is ongoing | For a fence that doesn’t need a notification, it makes sense to stick to the previous rules |
Three examples from Piaseczno and the surrounding area
House in Józefosław, 1.8 m aluminium slat fence
No notification (up to 2.20 m). The slats have no sharp tips. A 4.5 m sliding gate and a 1.0 m pedestrian gate are comfortably within the values in the draft. You don’t need to go to any office at all. That leaves the local zoning plan: plans in the Piaseczno municipality often include provisions on fences along roads, which you check at the Piaseczno Town and Municipality Office (Urząd Miasta i Gminy Piaseczno).
Property in Konstancin, 2.3 m solid fence along a busy street
Above 2.20 m, so a notification to the county office, Starostwo Powiatowe w Piasecznie: a form, a declaration of the right to use the property for construction purposes and a simple sketch. The county head (starosta) has 21 days from receiving the notification to object; no objection means you can build. In addition, the local zoning plans in Konstancin-Jeziorna restrict solid front fences in many areas, so the plan needs to be checked with the municipality before ordering.
Old 1.6 m fence with barbed wire in Góra Kalwaria
Barbed wire at a height of 1.6 m breached the previous ban (below 1.8 m). If the fence is replaced, the problem goes away. If the fence stays, it is better to remove the wire: the draft regulation raises the threshold to 2.2 m, so even moving the wire up to 1.9 m won’t give you peace of mind for long.
What the regulations don’t contain
- A maximum fence height: the general regulations don’t impose one; a local zoning plan or a landscape resolution can.
- A requirement for your neighbour’s consent to a fence entirely on your own plot: there is none. Consent is needed for a fence on the boundary line, because it stands partly on your neighbour’s land.
- An order to replace existing fences after the regulations change: no such provision exists, and we will only know what the new regulation says once it has been issued.
Before ordering a fence, check the local zoning plan and the landscape resolution with the municipality. If the fence is to be higher than 2.20 m, submit a notification to the county office and wait 21 days. For a lower one, stick to the previous technical rules until the new regulation is issued.
Frequently asked questions
Does a fence ordered before 20 September 2026 have to be changed?
No regulation currently requires that. The new regulation hasn’t been issued yet, so we don’t know its transitional provisions. For 18 months from 20 September 2026, a fence can be built to the previous rules (Articles 102a–102b).
Do the temporary provisions cover a fence that doesn’t need a notification?
Yes. For 18 months from 20 September 2026, Article 102b allows the previous technical rules to be applied to construction that requires neither a permit nor a notification (Article 29(2) of the Construction Law). A fence up to 2.20 m falls into this category. It is an option, not an obligation, but we have adopted these rules as our standard of workmanship.
Does a 2.0 m fence along the street need to be notified?
No. Up to 2.20 m there is no notification, including on the road side (the requirement to notify fences along roads was abolished on 28 June 2015). Do check the local zoning plan with the municipality, though: plans around Piaseczno often have their own provisions on fences along roads.
Sources
- Construction Law (Prawo budowlane), consolidated text (Dz.U. 2026 poz. 524), Articles 29–30 (ISAP)
- Act of 31 July 2026 (Dz.U. 2026 poz. 1161), temporary provisions, Articles 102a–102c of the Construction Law (Prawo budowlane)
Legal position as of October 2026. General information, not legal advice.
Quote after a site survey
We’ll come out for a site survey and prepare a quote within 7 working days of it. There is a charge for the site survey because it covers travel, measurements including levels, and choosing the system; the cost is agreed individually and deducted from your order. Manufacturer’s warranty – Wiśniowski fences come with an anti-corrosion warranty of up to 10 years. The terms of our own installation warranty are set out in the quotation.
Request a quote