How to prepare a sliding gate for winter
A cantilever sliding gate has no track across the entrance, but in winter there is still plenty that can block it: compacted snow under the leaf, ice on the end roller and in the catcher, frost on the photocells. Below is a list of jobs to do before the first frost, and rules for the whole season, for owners of motorised sliding gates.
The strip under the leaf
The leaf of a cantilever gate travels above the ground, with a clearance of about 10 cm. Snow left lying gets compacted under the leaf, freezes and props it up from below, and the gate will simply drive into a larger drift. After snowfall, clear the whole strip the leaf travels over, including the stretch along the fence where the gate tucks away when open. If the leaf is stuck in a drift, don’t run the motor with the remote. It will stop on overload, and after a few attempts you can damage the gear rack.
Roller carriages, end roller and catcher
The leaf is guided by roller carriages next to the motor post, and when it closes, its end roller runs into the catcher on the post on the other side of the entrance. That is where grit, leaves and ice collect. Before winter, clean the carriages, the roller and the catcher, then lubricate them according to the gate manufacturer’s instructions, only at the points the instructions specify.
Gear rack
The gear rack is not lubricated: grease picks up sand, which acts like sandpaper on the motor’s drive gear. Simply wipe it with a dry cloth. Uneven running or ‘skipping’ means the rack has gone out of adjustment. Report it to a service technician in autumn, before the frosts arrive.
Photocells and warning light
Snow and frost on the photocells are the most common reason why a gate ‘won’t close’. Wipe the lenses and check that they are not blocked by a snowdrift. An iced-up warning light doesn’t stop the gate, but it has to be visible from the road, so clean that too.
Emergency release
In a power cut, the gate is opened by hand after releasing the motor with a key. In winter, this lock can freeze. Keep lock de-icer at home, put a little lock lubricant into the cylinder once a season, and check every few weeks that the release works without forcing.
What not to do
- Don’t pour hot water over the leaf or the catcher. The water will freeze even faster, and in a thicker layer.
- Don’t spread salt under the leaf or on the gear rack or drive gear. Salt speeds up the corrosion of steel and galvanising.
- Don’t ‘help’ the gate by hand while it is running on the motor. It will stop on its safety cut-out, and your hand could end up between the leaf and the post.
Pre-winter check
The best time is October or November, before the first frost. When a gate ‘won’t move’ in winter, snow or ice is usually to blame, so the list is short:
- Clear sand and leaves from the roller carriages, end roller, catcher and gear rack.
- Wipe the photocells and check that the gate stops when you break the beam with your hand while it is closing.
- Check the emergency key release.
- Inspect the cables at the motor and the condition of the warning light.
- If the motor has a backup battery, check that it holds its charge.
If the gate runs stiffly even though the strip is clear and the catcher clean, or if it is more than a few years old, book a service before the season: the technician checks the roller carriages, drive gear, slowdown before the end of travel and force settings. With a new driveway gate, plan a hard-surfaced strip under the leaf from the start (paving or concrete), which takes a few strokes of a shovel to clear in winter.
Frequently asked questions
Should I switch the gate motor off for winter?
There’s no need. Driveway gate motors are designed to work at sub-zero temperatures, usually down to about −20 °C; the exact range is given in the manual. Keeping the strip under the leaf, the roller carriages and the catcher clean matters more than ‘sparing’ the motor.
What if the leaf has frozen in place?
Don’t run the motor. Remove the ice at the end roller, in the catcher and under the leaf (with a scraper or lukewarm water), release the motor with the key and check that the gate moves easily by hand. Only then switch the automation back on.
Quote after a site survey
We’ll come out for a site survey and prepare a quote within 7 working days of it. There is a charge for the site survey because it covers travel, measurements including levels, and choosing the system; the cost is agreed individually and deducted from your order. Manufacturer’s warranty – Wiśniowski fences come with an anti-corrosion warranty of up to 10 years. The terms of our own installation warranty are set out in the quotation.
Request a quote